Go-live only happens after everything's actually been tested
Implementation testing and commissioning runs as a formal stage, every system verified against defined criteria before go-live, so risk isn't quietly moved into production.
What this means for your organisation
Implementation projects fail after handover more often than during it, a fault that testing would have caught surfaces instead in week one of production, when it's harder and more disruptive to fix. Testing and commissioning are treated as a genuine gate: nothing is signed off until it's been verified working, and go-live is supported directly rather than left to the receiving team.
What’s included
Hardware Testing
Physical hardware validated for correct installation and functional operation before it's considered ready for use.
Network Testing
Connectivity, throughput, and configuration testing across network infrastructure, confirming performance matches design before go-live.
Server Testing
Server hardware and configuration validated under test conditions, checking performance and stability before production traffic depends on it.
OS Testing
Operating system installation and configuration verified for correct behaviour, patch level, and compatibility with the applications it needs to run.
UAT
User Acceptance Testing coordinated with your teams, confirming the environment works for actual users and real workflows, not just in isolated technical tests.
Commissioning
Formal sign-off process bringing a system into live operation, with documentation confirming what was tested and what passed.
Go-Live Support
Hands-on support during the go-live window itself, so issues that only appear under real production load are caught and resolved immediately.
Delivered through the BlueMonk technology ecosystem
Delivered by group delivery entities rather than through manufacturer supply.
- Dev ITGroup delivery entity for implementation, managed services and support operations.
Four steps, agreed before anything starts
- 01
Define test scope
Hardware, network, server, and OS components identified for validation ahead of go-live.
- 02
Execute testing
Structured technical testing performed against defined success criteria.
- 03
Run UAT
Your teams validate real workflows before formal sign-off.
- 04
Commission and support go-live
System formally commissioned with documentation, and support provided through the actual go-live window.
More in Maintain
Tell us what the requirement looks like
Tell us what's being implemented and your target go-live date, we'll come back with a testing and commissioning plan that gets you to production with confidence.