Data-Centre Solutions
Assessment · Physical Build · Integration · Migration · Managed Operations · Exit

Your data centre. Planned, built, operated and exited

The full data-centre lifecycle is covered, from assessment and physical build through to IT integration, managed operations and eventual exit. Hardware is supplied separately; every other workstream is owned and delivered end to end.

Lifecycle stage · Build

The problem

Data-centre projects fail at the boundaries between teams

The civil build finishes before the IT hardware arrives. The integration team inherits an environment they did not design. Managed operations are handed to a different vendor after commissioning. And when the facility eventually exits, nobody planned for data destruction, asset recovery or environmental closure.

The BlueMonk approach

One programme. Every workstream named, owned and connected

The full data-centre scope is coordinated, physical build, IT integration, migration, managed operations and future exit, as one programme with one point of accountability. Hardware is supplied by DEV IT. Recovery and exit are managed by Deshwal Waste Management, a group company. Every boundary is explicit before the project starts.

The full lifecycle, covered

The full data-centre lifecycle

Assessment & Planning

Current environment review, capacity planning, facility scoping and programme design, before any commitment is made.

Physical Data-Centre Build

Civil and interior works, electrical distribution, UPS and PDU, precision cooling, racks and structured cabling, fire protection, physical access control and environmental monitoring, designed and commissioned end to end.

IT Infrastructure Integration

Servers, storage, backup appliances, networking and security hardware installed, configured and integrated into the physical environment.

Details

Hardware supplied by DEV IT.

Migration & Commissioning

Data and workload migration, testing against acceptance criteria, cutover planning and commissioning, with full handover documentation at completion.

Managed Operations

Ongoing management of the data-centre environment after commissioning, monitoring, preventive maintenance, incident management, service desk, field support and SLA reporting.

Data-Centre Exit

When the facility reaches end of life, de-installation, secure data destruction, asset recovery, recycling and environmental closure documentation.

Details

Managed by Deshwal Waste Management, a group company.

Who this is for

Who it is for

Enterprises building new on-premise capacity

New facility planned, built and commissioned as one coordinated programme.

Organisations consolidating data centres

Migration from multiple facilities into one, with decommissioning of the exited environments.

GCCs establishing India infrastructure

Full data-centre capability set up correctly from day one, with managed operations from go-live.

Enterprises planning a future exit

Decommissioning planned and executed with certified data destruction and environmental closure.

How it works

How your programme runs

  1. 01

    Assessment

    Current environment, capacity requirements, facility constraints and programme scope defined.

  2. 02

    Physical build

    Civil, electrical, cooling, racks, cabling, fire and access, designed and commissioned.

  3. 03

    IT integration

    Hardware supplied, installed, configured and integrated into the physical environment.

  4. 04

    Migration and commissioning

    Workloads migrated, tested and accepted. Handover documentation completed.

  5. 05

    Managed operations

    Monitoring, maintenance, support and governance from go-live.

  6. 06

    Exit

    De-installation, data destruction, asset recovery and environmental closure when required.

Next step

Discuss your data-centre requirement

Share your capacity requirements, facility constraints and timeline, and the programme scope is confirmed.