Data centre infrastructure, installed, commissioned and handed over ready to run
Civil and electrical readiness, rack installation, structured cabling and active hardware commissioning, available individually or as a complete scope.
What this means for your organisation
Data centre projects fail in the gaps, between the electrician and the rack installer, between the cabling contractor and the network engineer who has to make it all work. Passive infrastructure (the physical environment) and active infrastructure (the hardware that runs on it) are scoped to a single plan and commissioned as a whole system before handover. Take the complete scope, or only the part you need.

What’s included
Server Deployment
Physical installation, racking, and initial configuration of server hardware, procured or existing, into your data centre environment.
Storage Deployment
Storage array installation and integration, connected into your existing or newly-built network and backup architecture.
Switches & Routers
Core, distribution, and access-layer network hardware installed and configured for your specific topology.
Firewall
Perimeter and segmentation firewall installation and initial configuration, integrated into the network design from the start.
Rack & Stack
Physical rack installation, equipment mounting, and cable management, the foundational layer everything else sits on.
Structured Cabling
Copper and fibre cabling infrastructure, installed and tested to standard, with full labelling and documentation at handover.
UPS / PDU
Uninterruptible power supply and power distribution unit installation, sized and configured for your load and redundancy requirements.
Relevant OEMs & technology vendors
Technology options can be aligned to the requirements of your environment across leading OEMs and technology vendors.
Four steps, agreed before anything starts
- 01
Site assessment and design
Site survey, requirement analysis, and engineering drawings before any hardware moves.
- 02
Passive infrastructure installation
Rack installation, structured cabling, power, and environmental readiness.
- 03
Active infrastructure deployment
Server, storage, and network hardware installed, configured, and integrated.
- 04
Testing and commissioning
Cabling certification, power and redundancy testing, connectivity validation, and formal handover.
More in Build
Tell us what the requirement looks like
Tell us about your site, your timeline, and what's already in place, we'll come back with an infrastructure plan that covers passive and active elements as one project, not two.